|
Enterprising
Enterprises Production Techniques
Packaging

Kerb
stones over 300 cms (10 feet) of length ready for shipment. The
customer can then cut the kerbs to the specification required
thus avoiding carrying excessive stocks of ready made lengths
in varying measurements.

In
this photograph we see monuments being loaded into the container.
On completion we photograph every "stuffed" container in the event
of any insurance claims. The container will then be fumigated
before leaving our factory.

A
Gantry Crane: This gantry crane lifts rough blocks onto the
primary block saw trolleys and removes the sawn slabs when finished.
It is also capable of lifting full container loads (FCL) onto
the shipping lorries. The normal gross weight of the containers
is +/-22 metric tons.
Next
Section: The Tile Plant
|