Enterprising Enterprises Production Techniques

Packaging


Kerb stones over 300 cms (10 feet) of length ready for shipment. The customer can then cut the kerbs to the specification required thus avoiding carrying excessive stocks of ready made lengths in varying measurements.


In this photograph we see monuments being loaded into the container. On completion we photograph every "stuffed" container in the event of any insurance claims. The container will then be fumigated before leaving our factory.


A Gantry Crane: This gantry crane lifts rough blocks onto the primary block saw trolleys and removes the sawn slabs when finished. It is also capable of lifting full container loads (FCL) onto the shipping lorries. The normal gross weight of the containers is +/-22 metric tons.

Next Section: The Tile Plant

 

Copyright © 1999-2008 Enterprising Enterprises